Informed
• Arrange task list for team leaders
• Blackening quality inspection
• Carton box reduce lbs from 275 to 150 for chair: do drop test
• Check and push material
• Claim report
• Clear stock list
• Confirmed PI
• Consolidation downtime & Maintenance list
• Create standard D8 design marking for clients like McQueen and Urban
• Daily production report
• ECR
• Final inspection
• Final technical drawing
• Finishing quality inspection
• Hand Tools & Machinery control
• Hardware, glass, maintenance
• Input Inventory out ( 328 lines/day,8 fields/ line) =>send documents to Purchasing
• Leave request/ resignation request
• Pre-production meeting
• Production material quality
• Purchase request
• Receive sales orders and feedback
• Request for overtime
• Shipping and loading schedule
• Steel factory quality inspection
• Steel, cast iron purchase
• Wood factory quality inspection
• Wood, leather, fabric, foam, cushion, reclaim wood, upholstery, concrete, T rail, brass, carton, wooden crate, packing, solid surface, other (consumable)
• Wooden crate to carton box for leg cast iron: do drop test
• Have to experiences in Furniture